(Created page with "Please answer the following 10 multiple choice questions, then click 'submit' to check the result. The pass mark for a CPD certificate is 8 out of 10, and you may retake the quiz...")
 
 
Line 3: Line 3:
 
'''Good luck'''
 
'''Good luck'''
 
{{#psy_quiz:steel-the-safe-solution}}
 
{{#psy_quiz:steel-the-safe-solution}}
 +
 +
[[Category:CPD]]

Latest revision as of 12:11, 12 March 2019

Please answer the following 10 multiple choice questions, then click 'submit' to check the result. The pass mark for a CPD certificate is 8 out of 10, and you may retake the quiz as many times as you wish, but the questions will vary! Please note that one, two, three or all of the possible answers presented for each question may be right, and to gain a mark for that question all correct answers must be identified.

Good luck

Steel the safe solution

Which of the following statements is true?

Steel erection is always risky
Steel erection is never risky nowadays
Steel erection is hazardous but not risky if properly managed
Steel erection is always risky even if properly managed

The BCSA has developed industry safe site practice for which three of the following situations?

Erection of multi-storey buildings
Erection of grandstands and stadia
Steel erection in windy conditions
Metal decking and stud welding

Which three of these steps available to the designer can contribute towards making steel the safe solution?

Use of computers to model the erection sequence
Use of Eurocodes
Use of connection types that are standard wherever possible
Use of off-site prefabrication as far as practicable

When should steel erectors be allowed to climb on to the steelwork?

Never
Any time that an experienced erector decides
Only after a suitable method has been established in advance
Only whilst two safety lanyards are both attached, one to a MEWP and one to the steelwork

During frame design which three of the following issues will need resolving that affect the development of the design basis outline method of erection?

The stability concept for the part-erected structure including any requirements for temporary bracing or propping
Experience from any trial erection undertaken
Timing and method of grouting foundation connections
Use of profiled steel sheeting to provide lateral restraint

How does BCSA provide information on the competence of its member companies?

In terms of categories of steelwork
In terms of the recommended maximum size of contracts to be resourced
In terms of the identities of each company’s directors
In terms of numbers of HSE prosecutions

Prior to the issue of tender documents for construction, which two of the following issues that affect steel erection will need resolving?

Soil conditions affecting the safe operation of plant
Exact methods of providing safe access to positions of work and safe working positions
Access to the site and within the site
The lifting devices necessary

BCSA’s assessment of its member companies meets SSIP requirements, what does SSIP stand for?

Safety Schemes in Procurement
Steelwork Safety is Promotion
Safe Steel in Practice
Single Source in Procurement

When should fixing of metal decking start?

As soon as possible
As soon as the supporting beams are in place
After the steel frame is aligned and stable
Not until all steelwork is complete and grouted

Which are the three main hazards that occur during steel erection?

Moving large heavy components into position
The part-erected structure can be unstable
Erection is done on sites that are difficult to reach
Each project is different